Many aluminum door and window manufacturers have not really operated before buying the machines, so here are some details of the installation and commissioning of window&door machines.
Electricity
The voltage must be stable, the line will not affect the use of the machines and personnel operation as much as possible, and the ground line should be protected with a shield.
Gas Supply
Because the pressure of the window&door machines should ensure sufficient air supply, so that it can be better used, which is the basis to achieve cylinder compression. Under normal circumstances, the air supply and air pressure of window&door machines have fixed parameter requirements, that is, the air supply flow rate should reach 0.3, and the air pressure should also be able to reach 8 pressures. In the case of multiple windows and doors, it is necessary to prepare more gas tanks, which depends on the actual situation. If the air pressure is not reached, the accuracy of the window&door machines will have some corresponding effects, and the corresponding processing effect will also deviate from the expected phenomenon.

Preparation
There are many types of broken bridge aluminum window&door machines, and each kind of machines will have a variety of models, or a variety of machines parts are different, etc. Therefore, in the installation and commissioning of window&door machines, it is necessary to coordinate the work of each area and grasp every detail.
Space
In the machines use site, it is necessary to reasonably arrange the location of the machines, so as to achieve a one-stop process from the storage and sawing of raw materials to the delivery of finished doors and windows, and do not have the problem of cutting materials in the east and moving materials in the west.
Security
It is necessary to make the machines dedicated to special personnel, and post the specifications for the safe use of machines and the handling methods for safety accidents.
Maintenance
The maintenance of the machines should be carried out by a special person, and the power and gas should be cut off before the maintenance. After using it every day, clean up the machines and debris, and check the machines for abnormalities.